Jump to content
Sign in to follow this  
needles

Leg 2 Completed. A tad late.

Recommended Posts

00. Leg 2 is Under Way.

00. Leg 2 is Under Way.jpg

 

01. Heading for WP2

01. Heading for WP2.jpg

 

02. WP 3 Turning onto Heading 225.

02. WP 3 Turning onto Heading225.jpg

 

03. Turning at Tonstad for the Power Station and WP4.

03. Turning at Tonstad for the Power Station and WP4.jpg

 

04. WP 5 Lysebotn Hydro Plant is down there somewhere.

04. WP 5 Lysebotn Hydro Plant is down there somewhere.jpg

 

05. Lovely Weather.

05. Lovely Weather.jpg

 

06. Leg 2 Complete.

06. Leg 2 Complete.jpg

 

07. Route Map for Leg 2 MEBAR 2018.

07. Route Map for Leg 2 MEBAR 2018.jpg

  • Like 1

Share this post


Link to post
Share on other sites

Nicely done Brian.

Now just wait until you see what the weather has in store for you in the latter legs matey!!!

I hope your eyesight is top notch, I mean really really top notch!

:pilotic:  

 

  • Haha 1

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...