Any comments?
I went out and spent a bunch of $ (had to take out a loan too) on a major big time hauler. A 747. That meant I had to get a new base, CYVR, because my existing bases CYCD and CYYJ don't have long enough runways to handle the big fella.
Now I'm a bit teed off because AH1 is not generating jobs for the aircraft. Those it is generating sometimes hit the capacity numbers but the airports are not big enough to land on. Not much point in taking a job to an airport with a 2000M runway (what's with this Metre stuff, anyway?) when the aircraft needs 250